IH 30 WB RAMP over LAKE RAY HUBBARD

6.2 MI NE of IH 635 · County 113, Texas · Built 2024 · 1 Lanes · 6,460 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180570000911508
Year Built
2024
Length
96.2 m (315.6 ft)
Max Span
24.1 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
6,460
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.