IH 30 WB FR over LAKE RAY HUBBARD

2.24 Miles East of PGBT · County 113, Texas · Built 2024 · 2 Lanes · 6,460 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
180570000911507
Year Built
2024
Length
1738.3 m (5703.1 ft)
Max Span
42.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,460
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.