IH 30 EBFR over Lake Ray Hubbard
6.2 Mi NE of IH 635 · County 113, Texas · Built 2023 · 3 Lanes · 26,650 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
32.868544, -96.535147
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
IH 30 over Lake Ray Hubbard
Built 1995
NB Dalrock Flyover over IH 30
Built 2021
Bass Pro Dr over IH 30
Built 1960
IH 30 WB RAMP over LAKE RAY HUBBARD
Built 2024
IH 30 WB FR over LAKE RAY HUBBARD
Built 2024
PGBT (SH190) DC02 over IH30 WBFR & PGBT NBFR
Built 2012
SAPPHIRE BAY UTURN over IH-30
Built 2023
SAPPHIRE BAY SB over Dalrock Bypass
Built 2023
Sapphire Bay NB over IH-30
Built 2023
SAPPHIRE BAY NB over DALROCK ROAD/IH 30 FRNTG
Built 2023
Bridge Details
- Structure #
- 180570000911498
- Year Built
- 2023
- Length
- 1730.4 m (5677.2 ft)
- Max Span
- 42.7 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 3
- Daily Traffic
- 26,650
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.