Bass Pro Dr over IH 30

5.7 Mi NE of IH 635 · County 113, Texas · Built 1960 · 2 Lanes · 665 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570000911211
Year Built
1960
Reconstructed
2003
Length
94.2 m (309.1 ft)
Max Span
19.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
665
Material
Prestressed Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.