Sapphire Bay NB over IH-30
0000 · County 113, Texas · Built 2023 · 4 Lanes · 20,450 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.874503, -96.519325
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
SAPPHIRE BAY UTURN over IH-30
Built 2023
SAPPHIRE BAY NB over DALROCK ROAD/IH 30 FRNTG
Built 2023
SAPPHIRE BAY SB over Dalrock Bypass
Built 2023
IH 30 WB FR over LAKE RAY HUBBARD
Built 2024
IH 30 WB RAMP over LAKE RAY HUBBARD
Built 2024
NB Dalrock Flyover over IH 30
Built 2021
IH 30 over Lake Ray Hubbard
Built 1995
IH 30 EBFR over Lake Ray Hubbard
Built 2023
Bass Pro Dr over IH 30
Built 1960
MILLER RD over LAKE RAY HUBBARD
Built 1969
Bridge Details
- Structure #
- 180570000911500
- Year Built
- 2023
- Length
- 76.2 m (250 ft)
- Max Span
- 38.1 m
- Width
- 25.7 m (84.3 ft)
- Lanes
- 4
- Daily Traffic
- 20,450
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.