E RENNER RD over SPRING CREEK

0.15 MI E OF US 75 · County 085, Texas · Built 1984 · 6 Lanes · 16,126 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430E02465016
Year Built
1984
Reconstructed
2017
Length
63.7 m (209 ft)
Max Span
12.8 m
Width
33.7 m (110.6 ft)
Lanes
6
Daily Traffic
16,126
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$35,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.