US 75 NB OFF RP Q over RENNER RD

US 75 @ SH 190 · County 085, Texas · Built 1998 · 1 Lanes · 123,424 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430296405325
Year Built
1998
Length
221.9 m (728 ft)
Max Span
38.7 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
123,424
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.