US 75 NB FR over PRAIRIE CREEK

0.70 MI S OF G BUSH TPKE · County 085, Texas · Built 1991 · 3 Lanes · 13,290 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004706341
Year Built
1991
Length
46.6 m (152.9 ft)
Max Span
15.5 m
Width
11.9 m (39 ft)
Lanes
3
Daily Traffic
13,290
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.