US 75 NB FR over SPRING CREEK

0.30 MI S OF G BUSH TPKE · County 085, Texas · Built 1996 · 4 Lanes · 14,231 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004706348
Year Built
1996
Length
83.8 m (274.9 ft)
Max Span
21 m
Width
15.2 m (49.9 ft)
Lanes
4
Daily Traffic
14,231
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,000
Total Project Cost
$33,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.