US 75 over SPRING CREEK

0.30 MI S OF G BUSH TPKE · County 085, Texas · Built 1992 · 12 Lanes · 246,848 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004706345
Year Built
1992
Length
85.3 m (279.9 ft)
Max Span
21.3 m
Width
54.6 m (179.1 ft)
Lanes
12
Daily Traffic
246,848
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.