MOZART DRIVE over DRAINAGE
1.5 Miles North of US 79 · County 491, Texas · Built 2015 · 2 Lanes · 3,005 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.553964, -97.599122
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
LEONARDO DRIVE over DRAINAGE
Built 2017
LEONARDO DRIVE over DRAINAGE
Built 2019
LIMMER LP (CR 102) over DRAW
Built 2010
PARMA STREET over DRAW
Built 2014
CR 122 over MCNUTT CREEK
Built 2003
RED BUD LANE over CHANNEL A
Built 2019
SOFIA PLACE over DRAW
Built 2022
MARGARITA LOOP over DRAW
Built 2014
NORTH RED BUD LN over MCNUTT CREEK
Built 2007
CR 110 over McNutt Creek
Built 2018
Bridge Details
- Structure #
- 142460AA1605001
- Year Built
- 2015
- Length
- 19.6 m (64.3 ft)
- Max Span
- 2.6 m
- Lanes
- 2
- Daily Traffic
- 3,005
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.