CR 122 over MCNUTT CREEK
0.60 MI SW OF CR 110 · County 491, Texas · Built 2003 · 2 Lanes · 1,050 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.553433, -97.609558
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
NORTH RED BUD LN over MCNUTT CREEK
Built 2007
MARGARITA LOOP over DRAW
Built 2014
RED BUD LANE over CHANNEL A
Built 2019
MOZART DRIVE over DRAINAGE
Built 2015
PARMA STREET over DRAW
Built 2014
LEONARDO DRIVE over DRAINAGE
Built 2019
LEONARDO DRIVE over DRAINAGE
Built 2017
PALOMA LAKE BLVD over MCNUTT CREEK
Built 2015
PALOMA LAKE BLVD over MCNUTT CREEK
Built 2015
LIMMER LP (CR 102) over DRAW
Built 2010
Bridge Details
- Structure #
- 142460AA0531001
- Year Built
- 2003
- Length
- 10.7 m (35.1 ft)
- Max Span
- 2.4 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,050
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.