NORTH RED BUD LN over MCNUTT CREEK
1.6 MI N OF US 79 · County 491, Texas · Built 2007 · 2 Lanes · 5,596 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.555239, -97.614183
This bridge is in worse condition than 53.1% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
MARGARITA LOOP over DRAW
Built 2014
CR 122 over MCNUTT CREEK
Built 2003
PALOMA LAKE BLVD over MCNUTT CREEK
Built 2015
PALOMA LAKE BLVD over MCNUTT CREEK
Built 2015
RED BUD LANE over CHANNEL A
Built 2019
FRANCISCO WAY over DRAW
Built 2016
MOZART DRIVE over DRAINAGE
Built 2015
CR 112 over NORTH FORK MCNUTT CRK
Built 2008
LEONARDO DRIVE over DRAINAGE
Built 2019
BLUFFSTONE DR over DRAIN
Built 2005
Bridge Details
- Structure #
- 142460E00918001
- Year Built
- 2007
- Length
- 30.5 m (100.1 ft)
- Max Span
- 15.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,596
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.