LIMMER LP (CR 102) over DRAW
0.4 MI E OF CR 110 · County 491, Texas · Built 2010 · 3 Lanes · 2,764 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
30.562139, -97.599194
This bridge is in worse condition than 84.2% of bridges in County 491. The average bridge in Texas is 0 years old; this one is 16 years old.
Nearby Bridges
LEONARDO DRIVE over DRAINAGE
Built 2019
LEONARDO DRIVE over DRAINAGE
Built 2017
RED BUD LANE over CHANNEL A
Built 2019
MOZART DRIVE over DRAINAGE
Built 2015
CR 110 over DRAINAGE DITCH
Built 2020
CR 122 over MCNUTT CREEK
Built 2003
CR 112 over DRAINAGE DITCH
Built 2019
MARGARITA LOOP over DRAW
Built 2014
NORTH RED BUD LN over MCNUTT CREEK
Built 2007
LIMMER LOOP over DRAW
Built 2006
Bridge Details
- Structure #
- 142460AA0109002
- Year Built
- 2010
- Length
- 9.8 m (32.2 ft)
- Max Span
- 1.5 m
- Lanes
- 3
- Daily Traffic
- 2,764
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.