SOFIA PLACE over DRAW

0.6 MI N OF US 79 · County 491, Texas · Built 2022 · 2 Lanes · 500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
142460AA1366001
Year Built
2022
Length
19.2 m (63 ft)
Max Span
3 m
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.