SEILER RD over THOMAS CREEK
0.50 MI S OF FM 952 · County 123, Texas · Built 2003 · 2 Lanes · 24 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
28.967083, -97.594619
This bridge is in worse condition than 50.7% of bridges in County 123. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
FM 952 over SALT CREEK
Built 2019
FM 952 over THOMAS CREEK
Built 2014
SH 72 over SMITH CREEK
Built 2023
SH 72 over DRAW
Built 2023
COTTON PATCH RD over THOMAS CREEK
Built 2004
FM 952 over DRAW
Built 1955
SH 72 over DRAW
Built 2023
CABEZA RD over DRAW
Built 2014
GARFIELD RD over SALT CREEK
Built 2006
SH 72 over DRAW
Built 2023
Bridge Details
- Structure #
- 130620AA0269001
- Year Built
- 2003
- Length
- 24.4 m (80.1 ft)
- Max Span
- 23.8 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 24
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.