SH 72 over DRAW
5.36 MI W OF SH 119 · County 123, Texas · Built 2023 · 4 Lanes · 3,329 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
28.943447, -97.584706
This bridge is in worse condition than 50.7% of bridges in County 123. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
SH 72 over SMITH CREEK
Built 2023
SEILER RD over THOMAS CREEK
Built 2003
FM 952 over SALT CREEK
Built 2019
SH 72 over DRAW
Built 2023
FM 239 over MANAHUILLA CREEK
Built 1949
SH 72 over DRAW
Built 2023
FM 952 over THOMAS CREEK
Built 2014
CABEZA RD over DRAW
Built 2014
FM 952 over DRAW
Built 1955
CHARCO RD over DRAW
Built 2017
Bridge Details
- Structure #
- 130620027002189
- Year Built
- 2023
- Length
- 16 m (52.5 ft)
- Max Span
- 1.8 m
- Width
- 27.5 m (90.2 ft)
- Lanes
- 4
- Daily Traffic
- 3,329
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.