SH 72 over SMITH CREEK
3.28 MI E OF FM 239 · County 123, Texas · Built 2023 · 4 Lanes · 3,329 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
28.955511, -97.571192
This bridge is in worse condition than 50.7% of bridges in County 123. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
SH 72 over DRAW
Built 2023
SH 72 over DRAW
Built 2023
FM 952 over SALT CREEK
Built 2019
SEILER RD over THOMAS CREEK
Built 2003
FM 952 over THOMAS CREEK
Built 2014
CHARCO RD over DRAW
Built 2017
FM 2980 over SMITH CREEK
Built 1977
COTTON PATCH RD over THOMAS CREEK
Built 2004
FM 2980 over DRAW
Built 2022
FM 952 over DRAW
Built 1955
Bridge Details
- Structure #
- 130620027002188
- Year Built
- 2023
- Length
- 79.2 m (259.8 ft)
- Max Span
- 19.8 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 4
- Daily Traffic
- 3,329
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.