COTTON PATCH RD over THOMAS CREEK
2.25 MI SW OF CR 344 · County 123, Texas · Built 2004 · 1 Lanes · 211 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
28.989117, -97.613619
This bridge is in worse condition than 69.4% of bridges in County 123. The average bridge in Texas is 0 years old; this one is 22 years old.
Nearby Bridges
FM 952 over THOMAS CREEK
Built 2014
SEILER RD over THOMAS CREEK
Built 2003
FM 952 over DRAW
Built 1955
FM 2656 over DRAW
Built 1962
DWORACZYK ROAD over DRAW
Built 1930
FM 952 over SALT CREEK
Built 2019
GARFIELD RD over SALT CREEK
Built 2006
SH 72 over SMITH CREEK
Built 2023
SH 72 over DRAW
Built 2023
CABEZA RD over DRAW
Built 2014
Bridge Details
- Structure #
- 130620AA0186002
- Year Built
- 2004
- Length
- 12.8 m (42 ft)
- Max Span
- 6.1 m
- Width
- 6 m (19.7 ft)
- Lanes
- 1
- Daily Traffic
- 211
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.