SH 72 over DRAW

2.94 MI W OF SH 119 · County 123, Texas · Built 2023 · 4 Lanes · 3,329 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
130620027002187
Year Built
2023
Length
13.9 m (45.6 ft)
Max Span
1.8 m
Width
28 m (91.9 ft)
Lanes
4
Daily Traffic
3,329
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.