PR 3 48.8 KM over MATA REDONDA CREEK

1.5 KM SOUTH OF FAJARDO · County 053, Puerto Rico · Built 1995 · 2 Lanes · 10,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024101
Year Built
1995
Length
28 m (91.9 ft)
Max Span
26.8 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
10,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$491,000
Total Project Cost
$589,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.