PR 53 0.8 KM over MATA REDONDA CREEK

1.5 KM SOUTH OF FAJARDO · County 053, Puerto Rico · Built 1993 · 4 Lanes · 22,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
022981
Year Built
1993
Length
28.1 m (92.2 ft)
Max Span
26.9 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
22,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.