PR 195 0.01 KM over PR 3 45.4 km

AT INT PR 3 & PR 195 · County 053, Puerto Rico · Built 1988 · 4 Lanes · 9,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019151
Year Built
1988
Length
27.7 m (90.9 ft)
Max Span
27.7 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
9,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$826,000
Total Project Cost
$991,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.