PR 3 over IGUALDAD STREET

0.2 KM SE INT PR195 & · County 053, Puerto Rico · Built 1958 · 4 Lanes · 27,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
007261
Year Built
1958
Reconstructed
1988
Length
37.7 m (123.7 ft)
Max Span
14.1 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
27,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,653,000
Total Project Cost
$1,983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.