PR 53 SOUB 2.8 KM over FUTURE ROAD
2.5 KM SOUTH OF FAJARDO · County 053, Puerto Rico · Built 1994 · 2 Lanes · 60,150 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
18.289633, -65.6496
This bridge is in worse condition than 65% of bridges in County 053. The average bridge in Puerto Rico is 0 years old; this one is 32 years old.
Nearby Bridges
PR 53 NORTB 2.8 KM over FUTURE ROAD
Built 1993
PR 53 over PR 982
Built 1994
PR 53 over DIRT ROAD
Built 1994
PR 53 1.8 KM over CONNECTOR TO PR 3
Built 1993
PR 3 52.0 KM over DEMAJAGUA RIVER
Built 1918
PR 3 48.8 KM over MATA REDONDA CREEK
Built 1995
PR 53 0.8 KM over MATA REDONDA CREEK
Built 1993
RAMP PR 975- PR53 over CEIBA CREEK
Built 1994
PR 975 0.5 KM over CEIBA CREEK
Built 1995
PR 53 over CEIBA CREEK & PR 975
Built 1994
Bridge Details
- Structure #
- 023022
- Year Built
- 1994
- Length
- 31.7 m (104 ft)
- Max Span
- 31.7 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 60,150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.