PR 53 over CEIBA CREEK & PR 975

0.8 KM NW OF CEIBA · County 037, Puerto Rico · Built 1994 · 4 Lanes · 22,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023081
Year Built
1994
Length
76.1 m (249.7 ft)
Max Span
35.7 m
Width
32.8 m (107.6 ft)
Lanes
4
Daily Traffic
22,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.