PR 53 over PR 3

1 KM SOUTH OF CEIBA · County 037, Puerto Rico · Built 1996 · 4 Lanes · 15,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024451
Year Built
1996
Length
32.8 m (107.6 ft)
Max Span
30.2 m
Width
34 m (111.5 ft)
Lanes
4
Daily Traffic
15,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.