PR 3 54.1 KM over EL CA¥O CREEK

0.5 KM EAST OF CEIBA · County 037, Puerto Rico · Built 1978 · 2 Lanes · 4,900 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
016241
Year Built
1978
Length
11.1 m (36.4 ft)
Max Span
5.5 m
Width
21 m (68.9 ft)
Lanes
2
Daily Traffic
4,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.