PR 53 0.4 KM over PR 978 5.9 KM

0.6 KM WEST OF CEIBA · County 037, Puerto Rico · Built 1994 · 4 Lanes · 22,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
023121
Year Built
1994
Length
29.6 m (97.1 ft)
Max Span
29.6 m
Width
34.3 m (112.5 ft)
Lanes
4
Daily Traffic
22,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.