PR 10 47.1 KM over CAGUANAS RIVER

4.5 KM NORTH OF UTUADO · County 141, Puerto Rico · Built 1992 · 4 Lanes · 11,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019821
Year Built
1992
Length
388 m (1273 ft)
Max Span
70.3 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
11,300
Material
Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.