PR 123 56.2 KM over SALTO ABAJO CREEK
1.4 KM NORTH OF UTUADO · County 141, Puerto Rico · Built 1892 · 2 Lanes · 7,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.275581, -66.713008
This bridge is in worse condition than 78% of bridges in County 141. The average bridge in Puerto Rico is 0 years old; this one is 134 years old.
Nearby Bridges
PR 123 56.3 KM over CAMBALACHE CREEK
Built 1892
PR 111 60.8 KM over GRANDE DE ARECIBO RIVER
Built 1965
PR 123 55.6 KM over GRANDE DE ARECIBO RIVER
Built 1980
PALMA STREET over VIVI RIVER
Built 1973
PR 611 0.01 KM over VIVI RIVER
Built 1947
ARCHILLA ST .01 KM over VIVI RIVER
Built 2005
PR 111 62.2 KM over UTUADO CREEK
Built 1965
PR 603 over GRANDE DE ARECIBO RIVER
Built 1947
PR 603 over GRANDE DE ARECIBO RIVER
Built 1947
PR 123 over ARENAS CREEK
Built 1922
Bridge Details
- Structure #
- 001561
- Year Built
- 1892
- Reconstructed
- 1970
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.8 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 7,800
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $195,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.