PR 123 55.6 KM over GRANDE DE ARECIBO RIVER
AT UTUADO TOWN · County 141, Puerto Rico · Built 1980 · 2 Lanes · 30,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.266525, -66.708686
This bridge is in worse condition than 5.1% of bridges in County 141. The average bridge in Puerto Rico is 0 years old; this one is 46 years old.
Nearby Bridges
PR 111 60.8 KM over GRANDE DE ARECIBO RIVER
Built 1965
PALMA STREET over VIVI RIVER
Built 1973
PR 611 0.01 KM over VIVI RIVER
Built 1947
PR 123 56.3 KM over CAMBALACHE CREEK
Built 1892
PR 123 56.2 KM over SALTO ABAJO CREEK
Built 1892
ARCHILLA ST .01 KM over VIVI RIVER
Built 2005
PR 111 62.2 KM over UTUADO CREEK
Built 1965
PR 123 over ARENAS CREEK
Built 1922
PR 603 over GRANDE DE ARECIBO RIVER
Built 1947
PR 603 over GRANDE DE ARECIBO RIVER
Built 1947
Bridge Details
- Structure #
- 016951
- Year Built
- 1980
- Length
- 108.4 m (355.6 ft)
- Max Span
- 18.1 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 30,800
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,875,000
- Total Project Cost
- $3,450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.