PR 123 62.5 KM over WATERWAY

15 KM S E OF ARECIBO · County 141, Puerto Rico · Built 1940 · 2 Lanes · 16,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012151
Year Built
1940
Length
6.2 m (20.3 ft)
Max Span
5.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
16,400
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000
Total Project Cost
$110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.