PR 123 over DEPRESSION

10 KM NORTH OF UTUADO · County 013, Puerto Rico · Built 1901 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
001611
Year Built
1901
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$65,000
Total Project Cost
$122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.