PR 10 52 KM over PR 621 3.5 KM & JOBS
7 KMS. N.E. OF UTUADO · County 141, Puerto Rico · Built 1990 · 3 Lanes · 11,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.322008, -66.679486
This bridge is in worse condition than 42.4% of bridges in County 141. The average bridge in Puerto Rico is 0 years old; this one is 36 years old.
Nearby Bridges
OFF PR 123 60.0 KM over CREEK
Built 1999
PR 123 over DEPRESSION
Built 1901
PR 123 66.5 KM over WATERWAY
Built 1940
PR 123 67.45 KM over WATERWAY
Built 1940
PR 984 5.15 KM over NARANJO CREEK
Built 1966
PR 123 67.0 KM over EL JOBO CREEK
Built 1940
PR 146 over GRANDE DE ARECIBO RIVER
Built 1942
PR 123 62.5 KM over WATERWAY
Built 1940
RURAL LOCAL ROAD over GRANDE DE ARECIBO RIVER
Built 1973
RURAL LOCAL ROAD over GRANDE DE ARECIBO RIVER
Built 1973
Bridge Details
- Structure #
- 019751
- Year Built
- 1990
- Length
- 151.8 m (498 ft)
- Max Span
- 36.4 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 3
- Daily Traffic
- 11,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.