PR 123 59.35 KM over EL MUERTO CREEK
4 KM NORTH OF UTUADO · County 141, Puerto Rico · Built 1892 · 1 Lanes · 5,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
18.295636, -66.706747
This bridge is in worse condition than 78% of bridges in County 141. The average bridge in Puerto Rico is 0 years old; this one is 134 years old.
Nearby Bridges
PR 123 KM 59.3 over DEPRESSION
Built 1892
PR 10 47.1 KM over CAGUANAS RIVER
Built 1992
PR 123 59.7 KM over CAGUANITAS RIVER
Built 1976
RURAL LOCAL ROAD over GRANDE DE ARECIBO RIVER
Built 1973
RURAL LOCAL ROAD over GRANDE DE ARECIBO RIVER
Built 1973
PR 123 56.2 KM over SALTO ABAJO CREEK
Built 1892
PR 123 56.3 KM over CAMBALACHE CREEK
Built 1892
PR 984 5.15 KM over NARANJO CREEK
Built 1966
PR 111 60.8 KM over GRANDE DE ARECIBO RIVER
Built 1965
PR 123 55.6 KM over GRANDE DE ARECIBO RIVER
Built 1980
Bridge Details
- Structure #
- 001571
- Year Built
- 1892
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.8 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 1
- Daily Traffic
- 5,000
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $118,000
- Total Project Cost
- $142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.