RURAL LOCAL ROAD over CHIQUITO DE MATON RIVER

5.5 KM NORTHWEST OF CAYEY · County 035, Puerto Rico · Built 1976 · 2 Lanes · 600 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
015641
Year Built
1976
Reconstructed
1993
Length
26.5 m (86.9 ft)
Max Span
6.1 m
Width
5.7 m (18.7 ft)
Lanes
2
Daily Traffic
600
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$66,000
Total Project Cost
$99,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.