PR 14 over MATON RIVER

7 KM NORTH WEST OF CAYEY · County 035, Puerto Rico · Built 1886 · 1 Lanes · 10,700 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
001771
Year Built
1886
Length
19.4 m (63.6 ft)
Max Span
17.8 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
10,700
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$202,000
Total Project Cost
$252,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.