PR 14 over WATERWAY
4.8 KM NORTHWEST OF CAYEY · County 035, Puerto Rico · Built 1890 · 2 Lanes · 5,944 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
18.136936, -66.195397
This bridge is in worse condition than 47.6% of bridges in County 035. The average bridge in Puerto Rico is 0 years old; this one is 136 years old.
Nearby Bridges
PR-14 over QUEBRADA TOITA
Built 2020
PR 7729 over LA PLATA RIVER
Built 1950
PR 7729 over CAÑA CREEK
Built 1969
PR 7730 0.1 KM over LA PLATA RIVER
Built 1973
RURAL LOCAL ROAD over CHIQUITO DE MATON RIVER
Built 1976
PR 730 over MATON RIVER
Built 1970
PR 102 10.30 KM over IRIZARRY CREEK
Built 1940
OFF PR 730 KM 3.9 over MATON RIVER
Built 1990
LOCAL ROAD over MATON RIVER
Built 1990
PR 171 6.0 KM over LA PLATA RIVER
Built 2000
Bridge Details
- Structure #
- 019871
- Year Built
- 1890
- Reconstructed
- 1950
- Length
- 14.6 m (47.9 ft)
- Max Span
- 4.5 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,944
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.