PR-14 over QUEBRADA TOITA
PR-14 65.3KM · County 035, Puerto Rico · Built 2020 · 2 Lanes · 5,400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
18.136817, -66.195386
This bridge is in worse condition than 20.7% of bridges in County 035. The average bridge in Puerto Rico is 0 years old; this one is 6 years old.
Nearby Bridges
PR 14 over WATERWAY
Built 1890
PR 7729 over LA PLATA RIVER
Built 1950
PR 7729 over CAÑA CREEK
Built 1969
PR 7730 0.1 KM over LA PLATA RIVER
Built 1973
RURAL LOCAL ROAD over CHIQUITO DE MATON RIVER
Built 1976
PR 730 over MATON RIVER
Built 1970
PR 102 10.30 KM over IRIZARRY CREEK
Built 1940
OFF PR 730 KM 3.9 over MATON RIVER
Built 1990
LOCAL ROAD over MATON RIVER
Built 1990
PR 730 3.9 KM over MATON ARRIBA CREEK
Built 1991
Bridge Details
- Structure #
- 030871
- Year Built
- 2020
- Length
- 31.5 m (103.3 ft)
- Max Span
- 30.2 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.