PR 7729 over LA PLATA RIVER

3 MILES N W OF CAYEY · County 035, Puerto Rico · Built 1950 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
006151
Year Built
1950
Length
32.9 m (107.9 ft)
Max Span
13 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$427,000
Total Project Cost
$513,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.