PR 712 over JAJOME CREEK
8 MILES N E OF SALINAS · County 123, Puerto Rico · Built 1965 · 2 Lanes · 800 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.047572, -66.198736
This bridge is in worse condition than 50% of bridges in County 123. The average bridge in Puerto Rico is 0 years old; this one is 61 years old.
Nearby Bridges
PR 712 over MAJADA RIVER
Built 1984
PR 52 N KM 49.5 over PR 714 & LA PALMA CR
Built 1974
PR 52 SOUTHBOUND over PR 714 & LA PALMA CR
Built 1974
PR 52 NORTHBOUND over DEPRESSION
Built 1974
PR 52 SOUTHBOUND over DEPRESSION
Built 1974
PR 52 NORB 48.7 KM over DEPRESSION
Built 1974
PR 52 NORTHBOUND over CATTLE PASS
Built 1974
PR 52 SOUTHBOUND over CATTLE PASS
Built 1974
PR 52 SB 48.7 KM over DEPRESSION
Built 1974
PR 52 NORB 45.8 KM over LAPAS RIVER & LOCAL
Built 1974
Bridge Details
- Structure #
- 009711
- Year Built
- 1965
- Length
- 35.4 m (116.1 ft)
- Max Span
- 13.5 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $34,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.