PR 52 NORTHBOUND over DEPRESSION

5 KM SOUTH WEST OF CAYEY · County 035, Puerto Rico · Built 1974 · 2 Lanes · 16,450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
020432
Year Built
1974
Length
110.7 m (363.2 ft)
Max Span
51.5 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
16,450
Material
Steel
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$2,201,000
Total Project Cost
$2,751,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.