PR 52 NORB 48.7 KM over DEPRESSION

6.1 KM SOUTHWEST OF CAYEY · County 035, Puerto Rico · Built 1974 · 2 Lanes · 16,450 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
020372
Year Built
1974
Length
192.8 m (632.5 ft)
Max Span
27.5 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
16,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$4,319,000
Total Project Cost
$5,182,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.