PR 52 NORTHBOUND over CATTLE PASS
6 KM SOUTH WEST OF CAYEY · County 035, Puerto Rico · Built 1974 · 2 Lanes · 16,450 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.078056, -66.2025
This bridge is in worse condition than 24.4% of bridges in County 035. The average bridge in Puerto Rico is 0 years old; this one is 52 years old.
Nearby Bridges
PR 52 NORB 48.7 KM over DEPRESSION
Built 1974
PR 52 SB 48.7 KM over DEPRESSION
Built 1974
PR 52 SOUTHBOUND over CATTLE PASS
Built 1974
PR 52 SOUB 45.8 KM over LAPAS RIVER & LOCAL
Built 1974
PR 52 NORB 45.8 KM over LAPAS RIVER & LOCAL
Built 1974
PR 52 SOUTHBOUND over DEPRESSION
Built 1974
PR 52 NORTHBOUND over DEPRESSION
Built 1974
PR 52 N KM 49.5 over PR 714 & LA PALMA CR
Built 1974
PR 52 SOUTHBOUND over PR 714 & LA PALMA CR
Built 1974
PR 1 over JUAN ORRACA CREEK
Built 1929
Bridge Details
- Structure #
- 020452
- Year Built
- 1974
- Length
- 28.5 m (93.5 ft)
- Max Span
- 26.9 m
- Width
- 28.5 m (93.5 ft)
- Lanes
- 2
- Daily Traffic
- 16,450
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $652,000
- Total Project Cost
- $815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.