PR 52 SOUTHBOUND over DEPRESSION

5 KM SOUTH WEST OF CAYEY · County 035, Puerto Rico · Built 1974 · 2 Lanes · 32,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
020422
Year Built
1974
Length
111.3 m (365.2 ft)
Max Span
50.7 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
32,900
Material
Steel Continuous
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$2,244,000
Total Project Cost
$2,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.