PR 1 7.4 KM over SAGRADO CORAZON STREET
9 KM S E OF OLD SAN JUAN · County 127, Puerto Rico · Built 1971 · 3 Lanes · 17,950 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
18.436833, -66.062058
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 55 years old.
Nearby Bridges
PR 1 7.4 KM over SGRDO CRZON ST 0.1 KM
Built 2000
PR 1 3.4 KM over PR 35 0.1 KM
Built 1958
RAMP PR 25 TO PR 1 over PR 35
Built 2000
PR 1 over MARTIN PE¥A CHANNEL
Built 1953
PR 25 8.0 KM over MARTIN PE¥A CHANNEL
Built 1939
PR 1 over LOS ANGELES STREET
Built 1971
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
Bridge Details
- Structure #
- 009202
- Year Built
- 1971
- Length
- 35.2 m (115.5 ft)
- Max Span
- 13.8 m
- Width
- 19.8 m (65 ft)
- Lanes
- 3
- Daily Traffic
- 17,950
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $976,000
- Total Project Cost
- $1,171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.