PR 1 over MARTIN PE¥A CHANNEL
9.5 KM S E OF SAN JUAN · County 127, Puerto Rico · Built 1953 · 6 Lanes · 35,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.433508, -66.060392
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 73 years old.
Nearby Bridges
PR 25 8.0 KM over MARTIN PE¥A CHANNEL
Built 1939
RAMP PR 25 TO PR 1 over PR 35
Built 2000
PR 1 3.4 KM over PR 35 0.1 KM
Built 1958
PR 1 7.4 KM over SAGRADO CORAZON STREET
Built 1971
PR 1 7.4 KM over SGRDO CRZON ST 0.1 KM
Built 2000
PR 1 over LOS ANGELES STREET
Built 1971
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
Bridge Details
- Structure #
- 006751
- Year Built
- 1953
- Reconstructed
- 1959
- Length
- 246.9 m (810 ft)
- Max Span
- 30.1 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 6
- Daily Traffic
- 35,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,752,000
- Total Project Cost
- $14,103,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.