PR 25 8.0 KM over MARTIN PE¥A CHANNEL

OVER M PE&A CHANNEL S · County 127, Puerto Rico · Built 1939 · 4 Lanes · 28,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
001851
Year Built
1939
Length
73.5 m (241.1 ft)
Max Span
14.5 m
Width
16.9 m (55.4 ft)
Lanes
4
Daily Traffic
28,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,453,000
Total Project Cost
$2,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.