PR 25 8.0 KM over MARTIN PE¥A CHANNEL
OVER M PE&A CHANNEL S · County 127, Puerto Rico · Built 1939 · 4 Lanes · 28,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
18.433656, -66.059064
This bridge is in worse condition than 89.6% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 87 years old.
Nearby Bridges
PR 1 over MARTIN PE¥A CHANNEL
Built 1953
RAMP PR 25 TO PR 1 over PR 35
Built 2000
PR 1 3.4 KM over PR 35 0.1 KM
Built 1958
PR 1 7.4 KM over SGRDO CRZON ST 0.1 KM
Built 2000
PR 1 7.4 KM over SAGRADO CORAZON STREET
Built 1971
PR 1 over LOS ANGELES STREET
Built 1971
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
PR-27 Km. 4.3 over Waterway Local Road
Built 2009
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
PR 1 PR 22 .2 KM over DEPRESSION
Built 1979
Bridge Details
- Structure #
- 001851
- Year Built
- 1939
- Length
- 73.5 m (241.1 ft)
- Max Span
- 14.5 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 4
- Daily Traffic
- 28,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,453,000
- Total Project Cost
- $2,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.