PR 1 PR 22 .2 KM over DEPRESSION
5 KM S E OF SAN JUAN · County 127, Puerto Rico · Built 1979 · 2 Lanes · 33,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
18.439369, -66.070178
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 47 years old.
Nearby Bridges
RAMP PR 1 TO PR 22 over RAMP MARGINAL ST TO PR 1
Built 1979
RAMP PR 1 TO PR 22 over PR 22
Built 1979
PR 22 over PR 1
Built 1971
RAMP PR 22 TO PR 1 over RAMP PR 1 TO L A STREET
Built 1979
RAMP PR 22 TO PR 1 over NATURAL SOIL DEPRESSION
Built 1979
PR 22 NRBD 1.7 KM over MARTIN PE¥A CHANNEL
Built 1970
PR 22 STHBD 1.9 KM over MARTIN PE¥A CHANNEL
Built 1980
PR 1 over LOS ANGELES STREET
Built 1971
PR 1 6.0 KM over CONCEPCION STREET
Built 1971
PR 22 0.7 KM over PR 35 2.4 KM
Built 1976
Bridge Details
- Structure #
- 016791
- Year Built
- 1979
- Length
- 149.7 m (491.1 ft)
- Max Span
- 15.5 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 33,900
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,635,000
- Total Project Cost
- $1,962,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.